Sign in with your email to run a lodge-ready H1/AS1 6th Edition schedule. We'll email you a sign-in code — no password.
Upload your drawing set. ConsentIQ pre-fills the construction R-values, you confirm the assumptions and enter the areas, and it produces a lodge-ready schedule. Schedule Method removed 27 November 2025 — Calculation Method only.
Drop PDF here or click to browse
Multi-sheet drawing set — sections, elevations, window schedule
Green = read straight off your drawings (source shown). Amber = an assumption or conservative default — each needs an individual tap to accept. Red = not found — pick a standard build-up or type the value. Walls and roofs are confirmed per-construction below.
Measured to the finished internal face (para 2.1.2.10). Net wall is derived for you.
We read the build-ups; you own the areas. Assign each construction its share of the net wall area. Add anything we missed, or build from scratch — the tool still calculates from manual entry.
One row per distinct roof or ceiling build-up — main, compressed perimeter, skillion, warm-roof. Areas sum to the net roof area.
| Element | Area (m²) | R-value | A/R (W/K) | Share |
|---|
Builds a lodge-ready H1 schedule from your confirmed values — preview below, download as PDF.
Unlock the lodge-ready, BCO-formatted H1 schedule for this project — full envelope table, minimum-R checks and method notes, ready to attach to your application. One unlock covers this project — re-generating the same address won't charge you again.
Secure payment via Stripe. You'll return here and your schedule will appear automatically.
Preview above is what the BCO will see. Click Save as PDF to download a clean, lodge-ready vector PDF — no browser print dialog, no headers or footers to switch off.