Sign in with your email to run a lodge-ready H1/AS1 6th Edition schedule. We'll send you a one-time link — no password.
Upload your drawing set. ConsentIQ pre-fills the construction R-values, you confirm the assumptions and enter the areas, and it produces a lodge-ready schedule. Schedule Method removed 27 November 2025 — Calculation Method only.
Drop PDF here or click to browse
Multi-sheet drawing set — sections, elevations, window schedule
Green = read straight off your drawings (source shown). Amber = an assumption or conservative default — each needs an individual tap to accept. Red = not found — pick a standard build-up or type the value.
Measured to the finished internal face (para 2.1.2.10). Net wall is derived for you.
| Element | Area (m²) | R-value | A/R (W/K) | Share |
|---|
Builds a lodge-ready H1 schedule from your confirmed values — preview below, download as PDF.
Preview above is what the BCO will see. Click Save as PDF — in the print dialog, set destination to Save as PDF and (optionally) turn off Headers & footers under More settings for the cleanest output.